Your Sany Equipment; Equipment Directions; Breaking In A New Equipment - SANY SSR150C-8 Safety, Operation & Maintenance Manual/Parts List

Single drum roller
Table of Contents

Advertisement

Introduction
1.2.3.7 Specifications
This section provides the general information
about this equipment. Some information may
change as design modification.

1.3 Your SANY Equipment

1.3.1 Equipment directions

(A) Front
(B) Back
(C) Left
(D) Right

1.3.2 Breaking in a new equipment

Your equipment has been well adjusted
and tested before delivery. However, initial
o p e r a t i o n o n t h e e q u i p m e n t i n s e v e r e
conditions will seriously affect the performance
or reduce the service life of the equipment.
Thus SANY recommends you to perform 100-
hour test run before putting the equipment into
production use.
During the break-in period:
Let the equipment warm up prior to any
operation.
Avoid operating or running the equipment
at a high speed in overload working
conditions.
Avoid sudden starting, rapid movement or
abrupt stop of the equipment.
Cool down the equipment system at the
end of every working day.
1-4
Safety, Operation & Maintenance Manual - January 2019
SSR150 Series Single Drum Roller
C
Fig.1-2
A
D
B

Advertisement

Table of Contents
loading

Table of Contents