Fans; Frost Thermostat; Cooling Circuit Danx 1/2/3 Hp - Dantherm DanX 1 User Manual

Hide thumbs Also See for DanX 1:
Table of Contents

Advertisement

5. COMMISSIONING

5.4 Fans

To commission the fans for the first time, the following actions have to be taken:
Check by hand if the fan wheel is turning freely.
Check that all dampers are open in the right way (see chapter 5.2 and 5.3)
Check if the duct system is clean and not blocked by any parts.

5.5 Frost thermostat

If a frost thermostat is installed, check if it is set to the correct temperature. The factory
setting is +8°C.

5.6 Cooling circuit DanX 1/2/3 HP

When starting the compressor of the cooling circuit for the first time, let the compressor run
for about 5 minutes and then check the sight glass of the cooling circuit to see if there is
enough refrigerant in the unit (no bubbles). If refrigerant is missing, stop the compressor at
once and check for a leakage.
1.
Compressor
2.
Evaporator
3.
Condenser
4.
Expansion valve
5.
Receiver
6.
Dry filter
7. Sight glass
8. Schrader valve
9. LP pressostat
10. HP pressostat
11. Water cooled condenser (option)
12. Magnetic valve for compressor start
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Danx 2Danx 3

Table of Contents