Unpacking And Commissioning; Unpacking; Initial Commissioning - sauter JCS 100 Operating Instructions Manual

Colour spectrometer
Table of Contents

Advertisement

7

Unpacking and commissioning

7.1

Unpacking

In the event of a return, please observe the instructions in the chapter
"Packaging/return transport
On receipt of the appliance, you should first check that no damage has occurred during
transport, that the outer packaging, the housing, other parts or even the appliance itself
have not been damaged. If any damage is evident, please notify SAUTER GmbH
immediately.
7.2

Initial commissioning

To ensure the function of the measuring device, it must be fully charged in the charging
station using the mains adapter supplied before use.
14 | en
JCS-BA-e-2410

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jcs 200

Table of Contents