Electrical Connections; Important Safety Instructions; Make Frame Grounding Connections; Make Ac Input And Ac Input Equipment Grounding Connections - Vertiv NetSure 710 Series Quick Start Manual

Hide thumbs Also See for NetSure 710 Series:
Table of Contents

Advertisement

5 Electrical Connections

5.1 Important Safety Instructions

DANGER! Adhere to the "Important Safety Instructions" presented at the front of this document.

5.2 Make Frame Grounding Connections

To do this...
Make Frame Grounding Connection to Relay
Rack
Make Central Office Ground Connection

5.3 Make AC Input and AC Input Equipment Grounding Connections

Refer to AC Input and AC Input Equipment Grounding Connections in the MAKING ELECTRICAL CONNECTIONS section of the
Installation Instructions (IM581127000) for a complete procedure.
The system provides either a separate AC input connection for each rectifier position or a separate AC input connection for every two
(2) rectifier positions in the factory installed module mounting shelves. Refer to the label provided on the AC input connector cover
and Figure 5.1.
Installation Instructions
See this in the
Relay Rack Grounding Connection (Frame Ground) in the MAKING
ELECTRICAL CONNECTIONS section.
Central Office Ground Connection in the MAKING ELECTRICAL
CONNECTIONS section.
Proprietary and Confidential © 2023 Vertiv Group Corp.
Vertiv™ NetSure™ 710 Series +24 VDC Power System Quick Start Guide
(IM582127000)
11

Advertisement

Table of Contents
loading

Table of Contents