Installing Gas Bottle And Testing Gas Flow - Kemppi Master M 353 Operating Manual

Table of Contents

Advertisement

2.10 Installing gas bottle and testing gas flow

Handle gas bottles with care. There is a risk of injury if the gas bottle or the bottle valve is damaged!
Always secure the gas bottle properly in an upright position to a special holder on the wall or on the welding equip-
ment cart. Always keep the gas bottle valve closed when not welding.
- If a transport unit with a gas bottle rack is used, install the gas bottle on the transport unit first, then make the con-
nections.
- Install the welding gun to the welding device before installing and testing the gas bottle.
Contact your local Kemppi dealer for choosing the gas and the equipment.
1.
Without gas bottle cart: Place the gas bottle in a suitable, secure location.
2.
With gas bottle cart: Move the gas bottle on the transport unit's gas bottle rack and secure it in place with the straps
and fixing points provided.
3.
If not already, connect the welding gun to the welding device (refer to "Connecting welding gun" on page 18).
4.
Connect the gas hose to the welding device.
© Kemppi
29
Master M 353, 355
Operating manual - EN
1921960 / 2307

Advertisement

Table of Contents
loading

This manual is also suitable for:

Master m 355

Table of Contents