6. Run the wire through the wire routing slot and
to the interlock. See Figure 4-29 on page 19.
7. Cut the wire to length and strip the wire
conductors.
8. Connect the interlock wires and the gate call/
send switch,Molex connection (if equipped).
Reference Quick Wiring on pages 28-30.
9. Reinstall interlock, gate post covers, and hole
plugs.
NOTE: Gates are field reversible (contact Harmar
Technical Service for instructions).
LOWER LANDING CALL
STATIONS
Check your state and local codes (ASME A18.1-2020)
for mounting height locations for the call stations.
Call stations can be mounted on a surface or flush-
mounted on a 2-gang outlet box.
1. Remove four (4) label plate screws and label
plate. See Figure 4-35.
Back
Key Lock
Cover
(optional)
Label Plate
Figure 4-35
2. Remove four (4) cover screws and the front
cover from the back cover.
Front
(4) Cover
Cover
Screws
VPL400-X: SECTION 3
3. If there is a lower landing call/send, replace
the lower landing jumper connector with the
lower landing cable and route the cable to the
lower landing call/send and connect the wires
as shown. See Figure 6-3 on page 31.
IF THERE IS NO LOWER LANDING CALL/
SEND, CUT THE RED JUMPER WIRE.
See Figure 4-36.
Figure 4-36
4. If using the back cover for a wall mount setup,
cut out the desired knock-out for wire routing.
There are four (4) knockouts on the back
cover. Two (2) on the back surface, one (1) on
the top and one (1) on the bottom.
5. If using a flush-mounted setup the back cover
can be discarded.
6. Mount back cover to the wall using
appropriate fasteners through four (4) holes in
the back surface of the back cover.
7. Use crimp to make cable connections in the
call station.
8. Install the front cover to back cover or in-wall
outlet box with four (4) cover screws.
9. Install label plate on the front cover with four
(4) label plate screws.
10. If the routing of the wires changes, be sure to
zip tie them out of the way of moving parts
(ex. Carriage rollers).
VPL400-X:
21JULY2023 | 630-00159 B
PREPARATION
Lower Landing
Red Jumper
Wire
Install Manual