Top Landing Gate (Optional) - Harmar Mobility CPLP400 Installation And Owner's Manual

Commercial platform lift
Table of Contents

Advertisement

13

Top Landing Gate (optional)

The optional top landing gate is provided with a combination
mechanical lock and electric contact (interlock).
The interlock:
Prevents the lift from running if the gate is not closed.
Prevents the gate from being opened if the platform is
not at the top landing.
Unlocks when the lift is on the upper limit switch.
A crescent shaped key is provided to manually unlock the gate
during installation. The key is inserted from the back
side to lift up on the solenoid that holds the gated
locked.
Mount the gate by placing onto the upper landing
making sure to align the gate opening with the platform
(outer guard rail not shown for clarity).
There are a number of attachment holes provided in the
threshold portion of the gate for mounting using wood
lag screws or concrete anchors as appropriate.
Remove the latch post cover and connect the call-send
and interlock wire harnesses.
The vertical posts of the gate must be attached to a
supporting structure, (the gate is not designed to be
freestanding).
A length of multi‐conductor wire will 
need to be ran from the bottom of the lift 
tower up to the landing gate.  Consult 
local codes for type and mounting 
requirements.  After wiring is completed, 
the wiring harness must be plugged into 
it appropriate receptacle on the 
controller (ref pg 5). 
Wiring Connections 
Interlock Harness 
Black 
Black 
Yellow 
Yellow 
*Must be tied together
 Call‐Send Harness 
  Lift Harness 
Blue 
Yellow 
Red 
Lift Harness 
 Black  
 Green 
 White 
 Orange 
*Blue
* Brown
 Blue 
 White 
 Red 

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpl600Cpl800Cpl1000Cpl1200Cpl1400Cpl400 ... Show all

Table of Contents