VPL400-X: SECTION 4
INSTALLATION
3. With the gate in the open position place, it in
between the upright structural supports.
See Figure 4-30.
4. Use a level to ensure the gate is aligned with
the opening. See Figure 4-31.
VPL400-X:
Install Manual
20
21JULY2023 | 630-00159 B
Gate Post
Fastening
Points
Figure 4-30
Figure 4-31
5. Use the two (2) access holes on each side
of the gate to fasten it in place. Fasteners
are NOT supplied, ¼" x 2" lag bolts are
recommended. Fasteners with a low-profiled
head are recommend for the horizontal
mounting surface of the bottom gate
mounting flange. Counter sunk screws should
be used on the top of the gate flange.
See Figures 4-32 through 4-34.
Figure 4-32
Figure 4-33
Figure 4-34