QUICK START CHECKLIST

SITE PREP
Code Compliance
Upper Landing
Foundation Level
Electrical
Code: ASME 18.1-2020 relative to residential, NAEC and
Local Building; NFPA 70 (electrical code).
POSITION LIFT BENEATH LANDING
Remove Top Cap
Remove Front Panel
Verify Overhead Clearance at 79" min
TIP: Use material handling equipment with lifting straps
to avoid injury/damage.
ASSEMBLE PLATFORM
Attach Platform to Carriage
Bolt on Side Walls
Attach and Wire Control Panel
Auto Ramp*
Tip: Use 2'x4' beneath platform base when connecting to
carriage.
INSTALL LANDING GATE*
Screw to Landing
Pre-run Wiring
INSTALL FASCIA PANEL*
* If required/included
INSTALLATION QUICK START
Attach to Open Areas Under Gate
Ensure Smooth, Flush
No Gaps, Protrusions etc.
TIP: Use flat screw heads to avoid protrusions.
FINAL POSITIONING & ANCHORING
Level and Perpendicular
Anchor Tower Legs
Anchor Tower to Structure
Fixed Ramp Securement*
VERIFY CLEARANCES:
Platform opening to landing: 3/8" - 3/4"
WIRING & ELECTRICAL
Gates*/Doors/Interlocks
Call/Sends*
Dedicated Line to Primary Power Source
TIP: Use knockouts provided along tower to minimize wire
distance.
FINAL
Perform Final Function Tests
Insert permanent power installation
Reattach Top Cap and Front Cover
Operator Familiarization
Complete Warranty Form
Write Date/Info on Lift
VPL400-X:
VPL400-X: SECTION 5
Install Manual
21JULY2023 | 630-00159 B