VPL400-X: SECTION 4
INSTALLATION

BYPASS MODE

To operate the carriage during installation, prior to
gate and platform setup, several jumper plugs are
required.
1. Plug the Upper Landing Cable Connector and
Lower Landing Jumper Connector to the AC
Controller. The Upper Landing Cable does not
need to be wired into the gate interlock or
call/send at this point. See Figure 4-9.
Lower Landing
Jumper
2. Plug the cab control (8-pin), Safety Pan Jumper
(2-pin) and Platform Gate Jumper (4-pin) into
the Trailing Cable Connectors at the Platform
Harness. See Figure 4-10.
Safety Pan
Jumper
Trailing Cable
VPL400-X:
Install Manual
14
21JULY2023 | 630-00159 B
Upper Landing
Cable
Figure 4-9
Platform Gate
Safety Nut Cable
Jumper
Figure 4-10
3. Move the carriage up or down as needed to
finish the installation.
4. These jumpers may need to be removed at
the completion of installation. See Installation
Tower Check section on Page 23 .

PLATFORM CONNECTION

1. Fasten the platform arms to the carriage with
the 4 ½"-13 x 3 1/4" bolts using ¾" tools using
the low profile nyloc nuts on the lower bolts
and a standard nyloc nut on the upper bolts.
See Figure 4-11.
2. Slide the platform onto the carriage arms then
fasten it in place with 6 ¼"-20 X 5/8" Phillips
head bolt using a Phillips screwdriver.
See Figure 4-12.
Cab Control
Cable
Figure 4-11
Figure 4-12