Installation; Installing The Flue Duct And Roof Pass-Through - Kalfire Gi75/59F Installation Instructions Manual

Table of Contents

Advertisement

5

Installation

The upcoming sections provide information
about the installation of the gas fire:

- Installing the flue duct and roof pass-through

- Placing the gas fire
- Connecting the gas fire
- Cleaning and testing the gas fire
− Gas measurement
− Sustainability measurement
− Placing the restriction plates
− Placing and finishing the surround
− Placing decorative elements
5.1
Installing the flue duct and roof
pass-through
Place the flue duct and roof pass-through
according to the manufacturer's instructions.
Take the material regulations into account. See:
Installation Instructions, paragraph 2.3.
1.1.1
Configure the concentric flue duct system
WARNING!
This gas fire has been tested and approved
according to CE standard EN-613. The inspection
was carried out in combination with concentric
flue pipe systems (Ø 130-200 mm), rigid and/or
flexible, either Kalfire or Stocker (T600 N1 W V2
L50040 O50). Only these flue pipe systems may
be applied to the gas fire in order to continue
to comply with the inspection provisions. If
component parts or flue pipe systems made by
other manufacturers are applied, the warranty
and certification of the gas fire will lapse.
WARNING!
The concentric duct should be sealed between
the elements in the form of a rubber ring or tape.
WARNING!
No flexible duct should be connected directly to
the appliance. The first metre from the appliance
must always be carried out with a fixed pipe.
After the first metre, the inner pipe (flue) may be
made with a flexible pipe. The outer pipe (fresh
air supply) must consist entirely of a fixed pipe or
existing chimney. A concentric duct composed
entirely of flexible pipe is not allowed.
REMARK
Depending on the chosen flue pipe configuration
and length, the temperature of the concentric
flue duct will be between the 200°C and 350°C.
Two methods for configuring the chimney can be
applied;
You can configure a chimney according to
the chimney calculation. See: Chimney
calculation, paragraph 4.2 .
You choose configuration 1-6 belonging to
the product. See: flue duct configuration 1
through 6, paragraph 8.1.
5.1.2
Dakdoorvoer bestaand rookkanaal
aansluiten C91 (optie)
Connect roof pass-through of existing flue
duct C91 (option)
The flue gases are discharged through a flexible
or fixed inner pipe. The air supply runs through
the flue on the outside of the flexible or fixed
pipe.
If an existing flue duct is used, the fitter needs to
undertake a visual inspection beforehand. The
flue duct should have a minimum temperature
class of T400. The minimum dimensions of the
existing flue duct must equal the diameter of the
concentric material: 130/200 mm. In addition,
account needs to be taken of the chimney
calculation. See Chimney calculation, paragraph
4.2.
Figure 4: Roof pass-through
15

Advertisement

Table of Contents
loading

Table of Contents