If the operator is unable to elim
inate the fault, switch off the
equipment and contact the Tech
ATTENTION
nical Assistance Service, com
municating the model of the
product purchased.
9.3
CHECK/REPLACEMENT OF THE SACRIFICIAL
ANODE
The integrity of the Mg anode must be checked at least eve
ry two years (better once a year). The operation must be
performed by qualified personnel.
In fact, magnesium is a weakly charged metal compared to the
material of which the inside of the boiler is coated, therefore it
attracts first the negative charges that form with the heating of
water, consuming itself. The anode therefore "sacrifices" itself
by corroding itself instead of the tank. The boiler has an anode
mounted at the bottom of the tank.
Before doing the check:
• Close the cold water inlet.
• Proceed with emptying the boiler (see par. "9.4 EMPTYING
THE TANK").
• Unscrew the upper anode and check its corrosion; if the cor-
rosion affects more than 2/3 of the anode surface proceed
with replacement.
EN
184
fig. 75
cod. 3540000420 - Rev. 03 - 09/2023
EGEA TECH
9.4
EMPTYING THE TANK
When not in use, especially in the presence of low temperatu-
res, it is advisable to drain the water present inside the tank.
For the appliance in question, just disconnect the water inlet
connection (see par. "8.7 Hydraulic connections" on page 173).
Alternatively, if you are setting up the system, it is recommended
that you install a drain cock.
NB!: empty the system in case of low tempe
ratures in order to avoid freezing phenomena.
9.5
REPLACEMENT OF THE POWER CORD
DO NOT TAMPER WITH THE
POWER CORD.
If the power supply cable is dam
ATTENTION
aged, it must be replaced by the
manufacturer or the technical as
sistance service or in any case
by a person with similar qualifi
cations, in order to prevent any
risk.
The cable must be replaced in compliance with the laws in force
in the country where the product is used.
Replace the damaged power cord with a new one with the same
or equivalent characteristics to the original cord.
10. REQUIREMENTS FOR THE
OPERATION, SERVICE AND
INSTALLATION
10.1
GENERAL WARNINGS
Any maintenance operation must
be performed by qualified per
sonnel in accordance with the in
OBLIGATION
structions in this manual.
The unit must be placed in a
room that does not have continu
ous ignition sources (e.g. naked
OBLIGATION
flames, a gas appliance or elec
tric heater in operation).
Do not pierce or burn.
OBLIGATION
200 HT - 260 HT