Wacker Neuson BPS Series Operator's Manual page 34

Table of Contents

Advertisement

Commissioning
7.3 Putting into operation with Briggs & Stratton engine
2
A
3
A
A
34
Operator's Manual | BPS1030B, BPS1135B, BPS1340B, BPS1550B, BPS2050B | BPS | 5100066824 | 04/2023 |
Version: 5 | [en-US]
1.
Check engine oil fill level 1,
1
2.
Move the fuel cock 2 into position A.
3.
Move choke lever 3 to position A when the engine is cold.
4.
Move the throttle lever 4 into position A.
4
see Maintenance on page
37.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bps1030bBps1135bBps1340bBps1550bBps2050b

Table of Contents