kozy heat ROOSEVELT 29 BAK Installation And Operation Manual page 24

Direct vent gas fireplace insert
Table of Contents

Advertisement

Figure 8.3, Mantel Requirements and Clearances
24
FACING AND FINISHING
CEILING
55"
(1.4 m)
COMBUSTIBLE MANTEL
12" (305mm)
9" (229mm)
11
(286mm)
COMBUSTIBLE FLOOR
CEILING
55"
(1.4 m)
COMBUSTIBLE MANTEL
12" (305mm)
9" (229mm)
11
(286mm)
* required when installing on combustible oor using oor protector (#RT29-FLP)
See Figure 8.2 above for an enhanced view of the RT29-FLP
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
¼"
¼
8
"
(210mm)
⁄ "
28
(714mm)
¼"
¼
8
"
(210mm)
⁄ "
28
(714mm)
*¾"
(19mm)
#RVT-29-BAK R.3 November 2019

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rvt-29-bak

Table of Contents