Supermicro SuperStorage Server SSG-6049P-E1CR60H User Manual page 28

Table of Contents

Advertisement

SuperStorage Server SSG-6049P-E1CR60H/L/L+ User's Manual
Installing the Cable Management Arm
1. Slide CMA connector #1 forward onto the two posts on the rear of the right inner rail
(right side when viewed from the front). It snaps into place.
2. Slide CMA connector #2 forward onto the two posts on the rear of the right middle rail. It
snaps into place.
1
1
2
2
Figure 2-8. Installing the Connectors 1 and 2
28

Advertisement

Table of Contents
loading

This manual is also suitable for:

Superstorage server ssg-6049p-e1cr60l

Table of Contents