Lenovo ThinkEdge SE350 V2 User Manual page 160

Hide thumbs Also See for ThinkEdge SE350 V2:
Table of Contents

Advertisement

After this task is completed
• Connect the I/O-module-board power cable (see
• Install a front I/O bezel (see
• Install a front operator assembly (see
• Install a drive cage (see
• If necessary, install one or both M.2 boot drives onto the I/O module board (see
on page
106).
• Proceed to complete the parts replacement (see
 
Demo video
https://www.youtube.com/watch?v=uC3SFsq4HiM
 
Install a front I/O bezel
Follow instructions in this section to install a front I/O bezel.
About this task
To avoid potential danger, make sure to read and follow the safety information.
• S002
CAUTION:
The power-control button on the device and the power switch on the power supply do not turn off
the electrical current supplied to the device. The device also might have more than one power cord.
To remove all electrical current from the device, ensure that all power cords are disconnected from
the power source.
Attention:
• Read
"Installation Guidelines" on page 37
you work safely.
• Touch the static-protective package that contains the component to any unpainted metal surface on the
node; then, remove it from the package and place it on a static-protective surface.
Note: Depending on the specific configuration, the front I/O bezel and I/O module board might look different
from the illustrations in this section.
Procedure
Step 1.
Make preparations for this task.
a.
Make sure that the system board, bridge board, and I/O module board have been installed (see
"Install a system board (trained technician only)" on page
148, and
"Install an I/O module board" on page
ThinkEdge SE350 V2 User Guide
152
"Install a front I/O bezel" on page
"Install a front operator assembly" on page
"Install a drive cage" on page
and
"Safety inspection checklist" on page 38
"Cable routing for the I/O module board" on page
152).
86).
"Complete the parts replacement" on page
144,
150).
95).
"Install an M.2 boot drive"
161).
to make sure that
"Install a bridge board" on page
171).

Advertisement

Table of Contents
loading

This manual is also suitable for:

7da97dbk

Table of Contents