Preferential Kwh Rate Power Supply - Daikin Altherma 3 R MT F Series Installer's Reference Manual

Table of Contents

Advertisement

6
|
Application guidelines

6.4.4 Preferential kWh rate power supply

Installer reference guide
44
Example
Single-phase power meter
0
0
58 0
1 5 0
c
d
e
A
B
A Outdoor unit
B Indoor unit
a Electrical cabinet (L
/N)
1
b Power meter (L
/N)
1
c Fuse (L
/N)
1
d Outdoor unit (L
/N)
1
e Indoor unit (L
/N)
1
f Backup heater (L
/N)
1
Exception
You can use a second power meter if:
-
The power range of one meter is insufficient.
-
The electrical meter cannot easily be installed in the electrical cabinet.
-
230 V and 400 V three-phase grids are combined (very uncommon), because of
technical limitations of power meters.
Connection and setup:
-
Connect the second power meter to X5M/3 and X5M/4. See
the electricity
meters" [
-
In the software the power consumption data of both meters is added so you do
NOT have to set which meter covers which power consumption. You only need
to set the number of pulses of each power meter.
See
"6.4.4 Preferential kWh rate power
power meters.
General rule
Power meter 1: Measures the outdoor unit.
Power meter 2: Measures the rest (i.e. indoor unit and backup heater).
Setup
Connect power meter 1 to X5M/5 and X5M/6.
Connect power meter 2 to X5M/3 and X5M/4.
See
"9.3.4 To connect the electricity
a
b
X5M/5+6
c
f
A Outdoor unit
B Indoor unit
a Electrical cabinet (L
b Power meter (L
c Fuse (L
d Outdoor unit (L
e Indoor unit (L
f Backup heater (L
4
 128].
supply" [
4
meters" [
Three-phase power meter
0
0
58 0
1 5 0
a
b
45 08 96
.0 05
X5M/5+6
c
c
d
e
f
A
B
/L
/L
/N)
1
2
3
/L
/L
/N)
1
2
3
/L
/L
/N)
1
2
3
/L
/L
/N)
1
2
3
/N)
1
/L
/L
/N)
1
2
3
"9.3.4 To connect
4
 44] for an example with two
 128].
ERRA08~12E + ELVZ12S18+23E
Daikin Altherma 3 R MT F
4P708478-1 – 2023.05

Advertisement

Table of Contents
loading

Table of Contents