Precautions When Mounting The Outdoor Unit; To Provide The Installation Structure - Daikin Altherma 3 R MT F Series Installer's Reference Manual

Table of Contents

Advertisement

7
|
Unit installation

7.3.2 Precautions when mounting the outdoor unit

7.3.3 To provide the installation structure

Installer reference guide
72
Typical workflow
Mounting the outdoor unit typically consists of the following stages:
1
Providing the installation structure.
2
Installing the outdoor unit.
3
Providing drainage.
4
Installing the discharge grille.
5
Protecting the unit against snow and wind by installing a snow cover and baffle
plates. See
"7.1 Preparing the installation
INFORMATION
Also read the precautions and requirements in the following chapters:
"2 General safety
"7.1 Preparing the installation
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
NOTICE
Level. Make sure the unit is leveled in all directions. Recommended:
Use 4 sets of M12 anchor bolts, nuts and washers. Provide at least 150 mm of free
space below the unit. Additionally, make sure the unit is positioned at least
100 mm above the maximum expected level of snow.
Anchor points
site" [
4
precautions" [
 10]
site" [
4
 51]
800
4
 51].
(mm)
ERRA08~12E + ELVZ12S18+23E
Daikin Altherma 3 R MT F
4P708478-1 – 2023.05

Advertisement

Table of Contents
loading

Table of Contents