Preferential Kwh Rate Power Supply - Daikin EPRA18DAW1 Installer's Reference Manual

Hide thumbs Also See for EPRA18DAW1:
Table of Contents

Advertisement

5.4.4 Preferential kWh rate power supply

EPRA14~18DAV3+W1 + ETVZ16S18+23DA6V+9W
Daikin Altherma 3 H HT F
4P587503-1A – 2020.01
Example
Single-phase power meter
0
0
58 0
1 5 0
a
b
c
c
d
e
f
A
B
A Outdoor unit
B Indoor unit
a Electrical cabinet (L
/N)
1
b Power meter (L
/N)
1
c Fuse (L
/N)
1
d Outdoor unit (L
/N)
1
e Indoor unit (L
/N)
1
f Backup heater (L
/N)
1
Exception
You can use a second power meter if:
-
The power range of one meter is insufficient.
-
The electrical meter cannot easily be installed in the electrical cabinet.
-
230 V and 400 V three-phase grids are combined (very uncommon), because of
technical limitations of power meters.
Connection and setup:
-
Connect the second power meter to X5M/3 and X5M/4. See
the electricity
meters" [
-
In the software the power consumption data of both meters is added so you do
NOT have to set which meter covers which power consumption. You only need
to set the number of pulses of each power meter.
See
"5.4.4 Preferential kWh rate power
power meters.
General rule
Power meter 1: Measures the outdoor unit.
Power meter 2: Measures the rest (i.e. indoor unit and backup heater).
Setup
Connect power meter 1 to X5M/5 and X5M/6.
Connect power meter 2 to X5M/3 and X5M/4.
Three-phase power meter
c
e
A
A Outdoor unit
B Indoor unit
a Electrical cabinet (L
b Power meter (L
c Fuse (L
d Fuse (L
e Outdoor unit (L
f Indoor unit (L
g Backup heater (L
4
 97].
supply" [
5
Application guidelines
|
0
0
58 0
1 5 0
a
b
  
 
d
f
g
B
/L
/L
/N)
1
2
3
/L
/L
/N)
1
2
3
/L
/L
/N)
1
2
3
/N)
1
/L
/L
/N)
1
2
3
/L
/L
/N)
1
2
3
/L
/L
/N)
1
2
3
"8.3.4 To connect
4
 37] for an example with two
Installer reference guide
37

Advertisement

Table of Contents
loading

Table of Contents