How To Commission A New Sensor To An Existing Network With Known Network Id And Join Key; How To Dispose This Product - End Of Lifecycle - ABB GW100 User Manual

Wireless industrial network
Hide thumbs Also See for GW100:
Table of Contents

Advertisement

G OO D TO K N OW
9.15
How to Commission a New Sensor to an Existing
Network with Known Network ID and Join Key?
Log onto the gateway as admin user. Change the WirelessHART Network ID and Join Key to
be the same as is in the sensor which needs to be commissioned. After changing press Sub-
mit all. If the sensor is in the range of the gateway, it will after a few minutes appear in the
Devices page. Other devices will have gone offline during this time as the gateway is now op-
erating with different network credentials. Once the new sensor has joined and connected
then migrate this new sensor to the other network where the other sensors are residing. To
do so, change the Network ID and Join Key in the gateway to that of the previous network
and submit Migrate Network button. Let this process complete. Afterwards, the previously
joined sensors and the newly commissioned sensor will appear in the same network.
Note. If some sensors do not appear, it could be that they have gone into deep sleep mode
and may require a trigger to re-join the network. Refer to each sensor's user manual for de-
tails.
9.16
How to Dispose this Product – End of Lifecycle?
This product is compliant with European Directive 2012/19/EU, which is concerning waste of
electrical and Electronic Equipment. For notes on disposal in Europe visit www.abb.com.
3B NP 10299 2 B
HO W TO CO MMI SS IO N A NE W SENSOR TO A N
EX IST ING NET WORK WITH K NO WN NET WORK I D
A ND J OI N KEY?
61

Advertisement

Table of Contents
loading

Table of Contents