Making Connections And Powering Up; Power Connections; Figure 6: Removing Awin Gw100 Rev.2 From The Din Rail - ABB GW100 User Manual

Wireless industrial network
Hide thumbs Also See for GW100:
Table of Contents

Advertisement

I NSTA LLAT IO N
6. Continue attaching any other module(s) to the mounting rail as described in Step 1.
7. When all modules are installed, place an end clamp tight up against the left side of
the left-most module on the mounting rail. Then place a second end clamp tight up
against the right side of the right-most module on the mounting rail.
8. Connect AWIN GW100 rev.2's earth connection to an earth ground.
Connect the DIN rail to protective earth ground using a grounding terminal block. To re-
move AWIN GW100 rev.2 follow the procedure shown in
5.2

Making connections and powering up

5.2.1
3B NP 10299 2 B
ABB recommends the use of end clamps to prevent modules from sliding left
and right on the mounting rail.

Figure 6: Removing AWIN GW100 rev.2 from the DIN rail

Power connections

Installation notes:
– Installation, operation and maintenance may be carried out only by qualified
electricians. Follow the specified installation instructions. The applicable
specifications and safety directives (including the national safety directives),
as well as the general technical regulations must be observed during installa-
tion and operation. The technical data should be taken from the packaging
instructions and the certificates (conformity assessment, other possible ap-
provals).
– Opening the device or making changes to it is not permitted. Do not repair
the device yourself but, replace it with an equivalent device. Repairs may be
carried out only by the manufacturer. The manufacturer is not liable for any
damage due to violation of the prescribed regulations.
MAK I NG CONNE CTI ONS AND P OWER I NG UP
Figure
6.
27

Advertisement

Table of Contents
loading

Table of Contents