8. Commissioning

8.1 Commissioning tasks

For commissioning to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have 
been completed.
Tools
none
1.
Assembly finished including subsequent leakage test
none
Preparatory tasks
Illustration
1
3
2
CLEARPOINT
Prerequisites
Material
Description
1. Open the shut-off valve [1] on the inlet
side slowly
2. Open the shut-off valve [2] on the outlet
side slowly
3. Close the shut-off valve [3] of the bypass
pipe
V activated carbon filter with cartridge
®
Protective equipment
None