Control Operation; First Use - U-Line CDE224C Quick Start Manual

Table of Contents

Advertisement

QUICK START GUIDE

Control Operation

CONTROL FUNCTION GUIDE
FUNCTION
ON/OFF
Adjust Temperature
Toggle between º F / º C

First Use

Initial startup requires no adjustments. If the unit was
turned off, press and hold
See "Control Operation" section for more details.
NOTICE
Temperature displayed reflects actual
temperature inside unit.
If the temperature displayed is different than selected, the
unit is progressing towards the selected temperature. Time
to reach set point varies based upon ambient temperature,
temperature of product loaded, door openings, etc. U-Line
recommends allowing the unit to reach set points before
loading.
To dispense cold coffee, make sure the components are
assembled according to the instructions in GENERAL
INSTALLATION.
Fill the Keg
DE-PRESSURIZE SYSTEM
NOTICE
Before attempting to fill the keg it is
necessary to confirm system is
not pressurized.
1.
Shut off nitrogen tank by turning
handle clockwise until it stops.
COMMAND
Press
and hold for 5 seconds
Press
or
and release
Hold
and
for 5 seconds
for 5 seconds to turn unit on.
NOTES
Unit will turn On or OFF
When the display is flashing, press
adjust the set point temperature.
The display will change units
2.
Lift up on
pressure
release valve
ring. Allow
pressure to
release.
3.
Detach hoses from keg. (See General Installation
section of this guide.)
4.
Remove keg from refrigerator.
5.
Lift handle and remove lid.
6.
Fill keg with cold brew.
7.
Replace and lock down lid.
8.
Reattach hoses.
16
u-line.com
or
to

Advertisement

Table of Contents
loading

Table of Contents