•
Using the same approach insert 3th, 4rd and
remaining sections to the joints and secure
via bolts, as shown in images.
Head Platform Setup
•
Loosen the bolt of the Head platform and
remove the attached nut and washer.
•
Remove the threaded pin from the head
platform to install the head platform
assembly.
•
Install
the
Head
(leveling arm up) to the end of the smallest
section with the provided bolt, shaft collars,
washers, and nut.
•
Tighten all the Allen bolts, nuts with the help
of Allen and wrench to secure them
properly.
Attaching the Cable Guide Support Rod
•
Insert and secure the cable guide support
rods by matching them with the Section 2
cable guide Clamp.
Platform
assembly
11