Head Platform Setup; Cable Guide Support Rod Setup - PROAIM CINEMA P-W5P-WING Assembly Manual

24ft/7mtr wing camera crane film production package
Table of Contents

Advertisement

Using the same approach insert 3th, 4rd and
remaining sections to the joints and secure
via bolts, as shown in images.

Head Platform Setup

Loosen the bolt of the Head platform and
remove the attached nut and washer.
Remove the threaded pin from the head
platform to install the head platform
assembly.
Install
the
Head
(leveling arm up) to the end of the smallest
section with the provided bolt, shaft collars,
washers, and nut.
Tighten all the Allen bolts, nuts with the help
of Allen and wrench to secure them
properly.
Attaching the Cable Guide Support Rod
Insert and secure the cable guide support
rods by matching them with the Section 2
cable guide Clamp.
Platform
assembly
11

Advertisement

Table of Contents
loading

Table of Contents