PRODUCT INSTALLATION
Wall Drilling and Bracket Fixing
A
B
C
(OPTIONAL)
250
Firstly, proceed with the following drawings:
Draw a vertical line to the ceiling or up to the upper limit, at the center of the area in
●
which the cooker hood is going to be fitted.
Draw a horizontal line A at 1320 – 1700 mm above the cooker hood top.
●
Draw a horizontal line B at a minimum of 926 mm above the cooker hood top.
●
Draw a horizontal line C at a minimum of 730 mm (910 mm optional) above the
●
cooker hood top.
Markings:
Mark a point (1) on the horizontal line A, 60 mm to the right of the vertical reference
●
line.
Repeat this on the other side, ensuring that two marks are leveled.
●
Mark a point (2) on the horizontal line B, 80 mm to the right of the vertical reference
●
line.
Repeat this on the other side and on the vertical reference line, ensuring that three
●
marks are leveled.
Mark a point (3) on the horizontal line C, 130 mm (250 mm optional)to the right of the
●
vertical reference line.
Repeat this on the other side, ensuring that the two marks are on the same horizontal
●
line.
60
60
80
80
250
130
130
12
10
07
21
10
20
11
Optional
10
11
11