Installation; Wall Drilling And Bracket Fixing - Midea MH60A4300B-ES Instruction Manual

Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION

WALL DRILLING AND BRACKET FIXING

A
(2)
B
C
(OPTIONAL)
250
C
As a first step, proceed with the following drawings:
 A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be fitted.
 A horizontal line A at 1320 – 1700 mm above the cooker top.
 A horizontal line B at a minimum 926 mm above the cooker top.
 A horizontal line C at a minimum 730 (910 optional) mm above the cooker top.
Mark Points:
 Mark a point (1) on the horizontal line A, 60 mm to the right of the vertical reference line.
 Repeat this operation on the other side, checking that the two marks are leveled.
 Mark a point (2) on the horizontal line B, 80 mm to the right of the vertical reference line.
 Repeat this operation on the other side and on the vertical reference line, checking that the
three marks are leveled.
60
(1)
60
80
80
250
(3)
130
130
12
5
21
10
20
10
Optional
10
11
11
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mh90a4300b-esMh60a4300w-esMh90a4300w-es

Table of Contents