Download Print this page

Installation - Midea E60MEW2A09 Instruction Manual

Advertisement

INSTALLATION

WALL DRILLING AND BRACKET FIXING
B
A
C
Vertical reference line
As a first step, proceed with the following drawings:
A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the hood
to be fitted.
A horizontal line A at 980 – 1080 mm above the cooker top.
A horizontal line B at a X mm above the horizontal line A.
A horizontal line C at a 261 mm below the horizontal line A.
Mark Points:
Mark a point (1) on the horizontal line A, 80 mm to the vertical reference line.
Repeat this operation on the other side and on the vertical reference line, checking that the
three marks are leveled.
Mark a point (2) on the horizontal line B, 40 mm to the vertical reference line.
Repeat this operation on the other side , checking that the two marks are leveled.
Mark a point (3) on the horizontal line C, 180 mm to the vertical reference line .
Repeat this operation on the other side , checking that the two marks are leveled.
Fix the brackets :
Drill holes at the marked points with a ɸ10 mm drill bit.
Insert the Wall Plugs 11 into the holes.
Fix the hood fixing bracket 20 with 3 screws 10 (5 x 50) at the horizontal line A.
Fix a Chimney fixing bracket 21 with 2 screws 10 (5 x 50) at the horizontal line B ( optional ).
40
(2)
40
80
80
(1)
180
180
(3)
Option Chimney
5
1
400+0
2
400+300 390-620
3
400+390 390-710
X
/

Advertisement

loading