Riello DB4SMC01 AO FS1 T150 Installation, Use And Maintenance Instructions page 35

Industrial gas burners
Table of Contents

Advertisement

Available languages

Available languages

5
Preparation for start up
5.1
Combustion head setting
Loosen the screw 1) and turn the graduated sector 2) according dia-
grams Fig. 19.
The system allows an optimal setting even at a minimum firing rate.
Combustion head opening can be varied by moving the lever onto
holes from 0 to 6, Fig. 18.
The choice of the hole (0 - 6) to be used is decided on the basis of di-
agram (Fig. 19) against the required maximum output. Setting is pre-
arranged in the plant for the maximum power (hole 6).
When dealing with boilers featuring a strong back pressure, if air deliv-
ery is insufficient even with the damper fully open, you can use a differ-
ent setting to that illustrated in diagram (Fig. 19) - do this by moving
the lever onto the next highest hole numerically speaking, thus increas-
ing the combustion head's opening and hence air delivery.
DB 4 SM
N° Hole
3
2
1
0
1600
DB 6 SM
N° Hole
3
2
1
0
4000
All manuals and user guides at all-guidesbox.com
2000
2400
2800
3200
4400
5000
5400
5800
3600
4000
4400
4800
Maximum burner output
6200
6600
7000
1
0
2
D8299
D7905
5200
5600
6000
kW
D8417
Maximum burner output
7400
7800
8200
kW
Maximum burner output
Fig. 18
Fig. 19
13

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Db6smc01 ao fs1 t150200800682007527080068x75270x

Table of Contents