enphase IQ8MC Installation And Operation Manual page 25

Microinverters
Table of Contents

Advertisement

Set up and activate monitoring
To install the IQ Gateway and set up system monitoring and grid management functions, refer to the IQ Gateway
Quick Install Guide. This guide leads you through the following:
Connecting the IQ Gateway
Detecting devices
Connecting to the Enphase Installer Platform
Registering the system
Building the virtual array
NOTE: When the utility requires a profile other than the default IEEE 1547 (for example, grids managed by
Hawaii electric industries [HEI], including HECO), you must select an appropriate grid profile for your
installation.
You can set the grid profile through the Enphase Installer Platform, during system registration, or through the
Enphase Installer App at any time. You must have an IQ Gateway to set or change the grid profile.
25
IQ8MC/IQ8AC/IQ8HC Microinverters Installation and Operation Manual