Mounting And Demounting - General Information - ABB AC500 V3 System Manual

Automation builder, programmable logic controllers, control panels
Hide thumbs Also See for AC500 V3:
Table of Contents

Advertisement

Fig. 6: Installation of AC500-eCo V3 CPU/S500 modules in a control cabinet
1
Cable duct
2
Distance from cable duct ≥20 mm
3
Mounting plate, grounded

5.3 Mounting and demounting - general information

The control system is designed to be mounted to a well-grounded mounting surface such as a
metal panel. Additional grounding connections from the mounting tabs or DIN rail (if used), are
not required unless the mounting surface cannot be grounded.
2023/03/03
NOTICE!
Horizontal mounting is highly recommended.
Vertical mounting is possible, however, derating consideration should be made
to avoid problems with poor air circulation and overheating.
When vertically mounted, always place an end-stop terminal block on the
bottom and on the top of the modules to properly secure the modules.
With high vibration applications and horizontal mounting, we also recommend
to place end-stop terminals at the right and left side of the device to properly
secure the modules.
During panel or DIN rail mounting of all devices, be sure that all debris (metal
chips, wire strands, etc.) is kept from falling into the controller. Debris that falls
into the controller could cause damage while the controller is energized.
3ADR011074, 1, en_US
Mechanical planning and installation
Mounting and demounting - general information
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ac500-eco v3Ac500-xc v3Ac500-sCp600Cp600-ecoCp600-pro

Table of Contents