—
7 Configuration and programming
New to AC500?
We recommend to use the step-by-step instructions in the Getting started document to install
the engineering suite and to configure and program your first project.
Advanced
Detailed information is available in the installation and licensing document.
installation of
engineering
suite
Programming
All information about the configuration and the programming are available in the software
for PLC system
manual (contained in PLC Automation manual).
Activating soft-
Detailed information is available in the installation and licensing document.
ware licenses
2023/03/03
3ADR011074, 1, en_US
Configuration and programming
73