IBM BladeCenter JS22 Problem Determination And Service Manual page 135

Table of Contents

Advertisement

Table 18. CA000000 to CA2799FF checkpoints (continued)
v If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in
the Action column until the problem is solved. If an action solves the problem, you can stop performing the
remaining actions.
v See Chapter 3, "Parts listing, Type 7998," on page 235 to determine which components are CRUs and which
components are FRUs.
Progress code
CA00E199
CA00E19A
CA00E19B
CA00E19D
CA00E1A0
CA00E1A1
CA00E1A2
Description
The system is rebooting to enact changes
that were specified in the boot image
ELF header
NVRAM auto-boot? variable not found -
assume FALSE
NVRAM menu? variable not found -
assume FALSE
Create NVRAM node
User requested boot to SMS menus
using keyboard entry
User requested boot to open firmware
prompt using keyboard entry
User requested boot using default
service mode boot list using keyboard
entry
Action
1. Verify that:
v The bootp server is correctly configured;
then, retry the operation.
v The network connections are correct;
then, retry the operation.
2. If the problem persists:
a. Go to "Checkout procedure" on page
186.
b. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis
assembly" on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
Chapter 2. Diagnostics
121

Advertisement

Table of Contents
loading

This manual is also suitable for:

7998

Table of Contents