IBM BladeCenter JS22 Problem Determination And Service Manual page 129

Table of Contents

Advertisement

Table 18. CA000000 to CA2799FF checkpoints (continued)
v If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in
the Action column until the problem is solved. If an action solves the problem, you can stop performing the
remaining actions.
v See Chapter 3, "Parts listing, Type 7998," on page 235 to determine which components are CRUs and which
components are FRUs.
Progress code
CA00E131
CA00E134
CA00E135
CA00E136
CA00E137
CA00E138
CA00E139
Description
Create root node properties
Create memory node
Create HCA node
Create BSR node
Create HEA node
Create options node
Create aliases node and system aliases
Action
1. Reboot the blade server.
2. If the problem persists:
a. Go to "Checkout procedure" on page
186.
b. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis
assembly" on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Reboot the blade server.
2. If the problem persists:
a. Go to "Checkout procedure" on page
186.
b. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis
assembly" on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
Chapter 2. Diagnostics
115

Advertisement

Table of Contents
loading

This manual is also suitable for:

7998

Table of Contents