Epa Certification Loading - Enerzone DESTINATION 2.7 Installation And Operation Manual

Table of Contents

Advertisement

2.4

EPA Certification Loading

The loading methods shown below are those used during emissions certification.
2.4.1
Air control
The air control is located below the ash shelf on the right. To
open the air control, push the air control handle completely
to the left (High). This will increase the burn rate. To close
the air control, push the air control handle completely to
the right (Low). This will decrease the burn rate.
2.4.2
High burn rate (primary air control open)
Open the air control completely. Criss cross 10 small pieces
(2"x2") of wood into the firebox in 3 layers (2 at the bottom,
4 in the middle and 4 on top). Criss cross 10 to 12 finely
split kindling wood pieces over the small pieces of wood.
Tie knot with five sheets of paper and place them on top
of the kindling wood. Light up the paper and let the door
completely open until the 2 top layers are burning. Close the door. When the kindling and the
small pieces of wood are almost completely burnt out and it is possible to break them into small
pieces, level the coal bed and put 5 logs in the firebox. Place 2 small pieces (about 3" x 3") in
the bottom in a reverse V shape, then put two medium size pieces (about 4"x4") in an East-West
orientation in the back (over the reverse V). Put a big piece (about 5"x5") in the front over the
reverse V. Try to leave air space between the pieces. Let the door fully open for 3 minutes or
when the fire is fully established and close the door. Leave the air control fully opened.
2.4.3
Medium and low burn rate
On a 2" coal bed that is dark red, add 6 pieces of wood in the firebox. Place 2 small pieces
(about 2.5" x 2.5") in the bottom in a reverse V shape, then put 2 medium size pieces (about
4"x4") in an East-West orientation in the back (over the reverse V). Put a big piece (about 5"x5")
in an East-West orientation in the front (over the reverse V) and put a last medium size piece
(about 4"x4") over the two medium size pieces in the back. Try to leave air space between the
pieces. Let the door open at 90° for 3 minutes 30 seconds or when the fire is fully established
and close the door. Leave the primary air control open for approximately 5 minutes and then
close the primary air control halfway. After another 5 minutes, close the air control completely
for the low burn rate and 3/8" open for the medium burn rate.
Page 12
Installation and Operation Manual - Destination 2.7 Insert

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eb00058

Table of Contents