Pre-Operation Instructions; Unpacking And Product Confirmation - Mitsubishi Electric FR-A8NC Instruction Manual

Hide thumbs Also See for FR-A8NC:
Table of Contents

Advertisement

1

PRE-OPERATION INSTRUCTIONS

1.1

Unpacking and product confirmation

Take the plug-in option out of the package, check the product name, and confirm that the product is as you ordered and intact.
This product is a plug-in option made for the FR-A800/F800 series.
 Product confirmation
Check the enclosed items.
Plug-in option:
1
SD L.RUN
RD L.ERR
RUN
Earth plate:
1 (Refer to
page
16.)
8
PRE-OPERATION INSTRUCTIONS
Mounting screw (M3  8 mm):
3 (Refer to
page
16.)
CC-Link communication one-
touch connector plug:
2 (Refer to
page
23.)
Spacer:
2 (Refer to
page
16.)
Communication option LED
display cover:
1 (Refer to
page
14.)

Advertisement

Table of Contents
loading

Table of Contents