1
PRE-OPERATION INSTRUCTIONS
1.1
Unpacking and product confirmation
Take the control terminal option out of the package, check the product name, and confirm that the product is as you ordered
and intact.
The product is a control terminal option made for the FR-A800 series.
1.1.1
Product confirmation
Check the enclosed items.
Control terminal option...................................1
NOTE
• Connection diagrams in this Instruction Manual appear with the control logic of the input terminals as sink logic, unless
otherwise specified. (For the control logic, refer to the Instruction Manual of the inverter.)
PRE-OPERATION INSTRUCTIONS
1
7