Arrow Storage Products Mountaineer Series Owner's Manual & Assembly Manual page 46

Hide thumbs Also See for Mountaineer Series:
Table of Contents

Advertisement

ANCHORING OPTIONS...
IMPORTANT:
Doors must hang and swing level before anchoring building.
Anchor your building at this time. See below for details on anchoring.
After anchoring, drill a 5/8" (1,6 cm) hole at least 2" (5,1 cm) into your base to receive the
left-side Cane Bolt and hold the Door (left side only) closed.
Please take a moment to ensure that the building is installed in accordance
with these instructions and with all applicable regulations.
Anchoring Down The Building
The entire fl oor frame MUST be securely anchored once the building is erected.
Below are recommended ways of anchoring.
Arrow Anchoring Kit:
Recommended for use with any suggested base.
Contains: 4 Anchors with Cable, Clamps and
installation instructions.
Anchoring into Concrete:
1. For poured concrete slab or footing or patio blocks:
Use 1/4" x 2" (6 mm x 51 mm) Lag Screws.
2. For Anchor Post of Concrete poured after building is
erected: Use 1/4" x 6" (6 mm x 152 mm) Lag Screws.
1.
(Model No. AK4 or 60298)
OVER THE BEAMS
AND INTO THE GROUND
2.
Anchoring into Wood/Post:
Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm)
dia. holes provided in the frames for proper anchoring.
1.
Arrow Anchoring Kit:
Recommended for use with the concrete base.
Contains: Corner gussets, perimeter clips, hardware,
1/4" masonry drill bit and installation instructions.
46
2.
(Model No. AK100 or 68383)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Commander seriesCommander chd1025Commander chd1030

Table of Contents