Step 11: Continued
You will need for this page:
SS
(QTY: 52+)
(QTY: 6)
Continue to apply Weather Stripping.
At this point there should be only two Roof
11
Panels remaining. Install last two Roof Panels.
Because the last Ridge Cap is already in place
and has been secured at one end, you may need to
move the Ridge Cap slightly to secure the last two
Panels to the Main Roof Beams.
Finish weather stripping the roof under the
12
Ridge Cap and cut the Tape just past the end
of the roof. Fold end of Tape under roof edge.
With all Roof Panels in place, secure the bottom
13
of Roof Panels to the Side Wall Angles with
Small Screws on both sides of the building.
DO NOT fully tighten Ridge Cap
Bolts until you have both Ridge
Cap Bolts in place. This will ease assembly.
Bolts must be fully tightened before moving
on to the next page.
Alternate sides
while securing
roof panels.
SS
SB
2
7743
• Bolts under Ridge Cap pass thru slots where
Roof Panel
the End Roof Panel is overlapped by the Panel
next to it (labeled rib 5 below).
SS
36
SS
2
1
CUT
DO NOT secure ends of Ridge Caps
until Peak Caps are in place.
10'x15' (3,0 m x 4,6 m)
building shown.
5
4
3
SS

Advertisement