Arrow Storage Products Mountaineer Series Owner's Manual & Assembly Manual page 22

Hide thumbs Also See for Mountaineer Series:
Table of Contents

Advertisement

Step 6: Front Wall Install
You will need for this page:
LS
LS
(QTY: 2)
(QTY: 4)
SS
(QTY: 6)
10'x10' (3,0 m x 3,1 m)
building shown.
LS
10633
LS
1
Just as in the rear, carefully position
the Front Wall Assembly as shown
and secure with a Large Screw on
both sides. Install Front and Rear Side
Wall Channels using Large Screws.
2
Position the Door Jambs as shown
and secure to the Front Wall Panel
using Small Screws. Double check
that the holes in the Door Jamb line up with
the holes in the Wall Post (Hinge). If they
do not, the Left and Right Door Jambs
are most likely switched.
10633
Side Wall
Channel
If you purchased a Door Kit, install second Front Wall
Assembly on the rear of the building.
LS
2
1
10622
80037
Right Door
Left Door
Jamb
LS
SS
IMPORTANT: When installing
the Front Wall Assembly
in the building, two people
SS
should position and hold the
Assembly in place until it is
secure. Failure to do so could
result in bending the Front
Frame and Fascia pieces.
SS
80037
22
1
Assemblies from Step 3:
Front Wall Assembly
Jamb
10633
LS
LS
LS
10622

Advertisement

Table of Contents
loading

This manual is also suitable for:

Commander seriesCommander chd1025Commander chd1030

Table of Contents