Step 4: Truss Installation - Arrow Storage Products Mountaineer Series Owner's Manual & Assembly Manual

Hide thumbs Also See for Mountaineer Series:
Table of Contents

Advertisement

Step 4: Truss Installation

You will need for this page:
LS
SB
(QTY: 8)
(QTY: 4)
10632
10632
1
Assemble two sets of Side Frames by
overlapping them by 8 1/4" (21,0 cm) and
inserting two Small Bolts and Nuts as shown
above. These will form the left and right Floor Frames.
2
32 7/8" (83,5 cm) from the edge of each Floor
Frame, erect a Truss Assembly and secure
using a Large Screw on each side. Once two
Truss Assemblies are in place, connect them with a
Mid Side Wall Channel and secure with Large Screws.
Support Trusses until Mid Side Wall Channels are in
place.
LS
LS
10634
LS
LS
4
10632
Side Frame
SB
LS
10632
2
10634
Assemblies from Step 1:
Side Wall
Channel
SB
SB
SB
Notched side of Frame must
face inside building.
10634
LS
B
A
18
Truss Assemblies (2)
Overlap Length
8 1/4"
21,0 cm
10632
10632
Truss Spacing
A
32 7/8"
B
57 1/2"
LS
A
10632
10632
83,5 cm
146,1 cm

Advertisement

Table of Contents
loading

This manual is also suitable for:

Commander seriesCommander chd1025Commander chd1030

Table of Contents