Arrow Storage Products Mountaineer Series Owner's Manual & Assembly Manual page 35

Hide thumbs Also See for Mountaineer Series:
Table of Contents

Advertisement

Step 11:
You will need for this page:
SS
SB
(QTY: 32+)
(QTY: 8+)
Continue to apply Weather Stripping.
If you are erecting a 10'x10' (3,0 m x 3,1 m) building, skip this page
and move on to page 36.
6
Install two more Roof Panels. Continue to apply
Weather Stripping Tape as you go.
Where the last two Panels overlap over the
7
Truss, insert two Small Bolts and Nuts and seal
with two 2" (5,1 cm) strips of Tape.
8
Install two more Roof Panels.
Overlap the last Ridge Cap installed with the next
9
Ridge Cap and secure with two Small Bolts and
Nuts as shown.
Repeat the steps on this page until you have only two Roof Panels
10
remaining. Before moving on to the next page, all Ridge Caps should be
in position, but the ends of the Front and Rear Ridge Caps at the front
and rear of the building should not be secured yet.
Continued for Extension Modules
4+
7743
Ridge Cap -
Roof Panel
SB
35
1
10621
10680
Ridge Cap -
FR
Mid
DO NOT fully tighten Ridge Cap Bolts
until you have both Ridge Cap Bolts
in place. This will ease assembly. Bolts must
be fully tightened before moving on to the next
page.
SB
Place strips of Tape over Bolts to seal.
(Under Ridge Cap)
0+

Advertisement

Table of Contents
loading

This manual is also suitable for:

Commander seriesCommander chd1025Commander chd1030

Table of Contents