Arrow Storage Products Mountaineer Series Owner's Manual & Assembly Manual page 45

Hide thumbs Also See for Mountaineer Series:
Table of Contents

Advertisement

Step 13: Continued
Slide Bolt may need adjustment
to align properly.
You will need:
FS
(QTY: 36)
FS
IMPORTANT:
opening and check that it is 98 1/4" (249,6 cm). If it is not, move the front walls in or out
slightly to match this dimension. This must be done BEFORE anchoring.
6
66609
Hinge
FS
Once the building is fully assembled, measure across the door
If Slide Bolt does not align properly, you may
need to insert plastic washers between the
door and the Slide Bolt to ensure proper
fi t. Adjust number of plastic washers until
desired fi t is reached.
Hanging the Doors:
After the Doors have been assembled, install hinges on one
Door using fl athead Screws and Nuts. Use the image to the
left as a guide to proper hinge position. Next, position one
Door in the doorway of the building and secure the hinges,
from top to bottom, to the Door Jamb, but do NOT fully tighten.
With all hinges in place, hold the Door in alignment and slowly
tighten the Bolts on the Door Jamb side of the hinge. Repeat
to hang the other Door.
Swing the Doors carefully to check alignment. If Doors are
misaligned, slightly loosen the Bolts on the Door Jamb side of
the hinge and realign the Door. Fully tighten when done.
45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Commander seriesCommander chd1025Commander chd1030

Table of Contents