Download Print this page
Arrow Storage Products VM108 Owner's Manual & Assembly Instructions

Arrow Storage Products VM108 Owner's Manual & Assembly Instructions

Advertisement

Quick Links

Owner's Manual & Assembly Instructions
G01
Model No. VM108
704741207
BUILDING DIMENSIONS
*Approx.
Foundation
Size
Size
10' x 8'
121" x 92 3/4"
3,0m x 2,3m 307cm x 236cm
* Size rounded off to the nearest foot
Storage Area
Sq. Ft. Cu. Ft.
Width
74
467
123 1/4"
6,9m
2
13,2m
3
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
Exterior Dimensions
(Roof Edge to Roof Edge)
Depth
Height
95 1/4"
86"
313cm
242cm
218cm
Interior Dimensions
(Wall to Wall)
Width
Depth
Height Width Height
118 1/4"
90"
84 3/4" 55 1/2" 64 1/2"
300cm
229cm
215cm
Door
Opening
141cm 164cm

Advertisement

loading
Need help?

Need help?

Do you have a question about the VM108 and is the answer not in the manual?

Questions and answers

Summary of Contents for Arrow Storage Products VM108

  • Page 1 Owner's Manual & Assembly Instructions Model No. VM108 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ 704741207 SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES...
  • Page 2 BEFORE YOU BEGIN..Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model.
  • Page 3 PLAN AHEAD..Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building.
  • Page 4 SAFETY FIRST..Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various •Practice caution with the tools being used in the pieces of your building since some contain assembly of this building. Be familiar with the sharp edges.
  • Page 5 CARE & MAINTENANCE..A5 Web Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch- up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation. Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom.
  • Page 6 ACCESSORIES..A6 WEB ROOF STRENGTHENING FLOOR FRAME KITS (heavy snow load) KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof by 50%. ANCHOR KITS Model No. AK4 MODELS FB47410, FB5465, FB106-A Anchor Kit contains heavy-duty steel FB109-A and FB1014-A augers, 60' (18m) of steel cable and 4 cable...
  • Page 7 THIS PAGE LEFT BLANK INTENTIONALLY...
  • Page 8 THIS PAGE LEFT BLANK INTENTIONALLY...
  • Page 9 Foundation The Foundation For Your Building OPTION 1: ARROW FLOOR FRAME KIT: (Order No. FB109-A or 68385-A) Arrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used with one of the following: A.
  • Page 10 Anchoring Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" Wood Screws. There are 1/4" (0,63cm) dia. Recommended for use with any suggested base.
  • Page 11 Hardware Remove from bag of screws and save for the last step 65900A 65103 #10Bx1/2" Black Screw (8) 65923 65004 #8-32 Hex Nut (149) (Packed with Screws) #8-32x3/8" Bolt (149) #8Ax5/16" Screw (312) 67468 66646 66045 67545 Peak Cap (2) Washer (198) Handle (2) Weather Stripping (1)
  • Page 12: Parts List

    Parts List Assembly Part Part Quantity Check Key No. Number Description in Carton List 3719 Door Handle Brace 5290 Front Siding (6 Board) 5291 Front Siding (3 Board) 5306 Rear Siding (6 Board) 5307 Rear Siding (3 Board) 5986 Rear Wall Angle 10497 Horizontal Door Brace 6403...
  • Page 13 Assembly by Key No. 24 24 24 24 19 10 42 20 37 27...
  • Page 14 ● ● ● ● ● 8934 Ramp (1) ● Parts Needed For ● ● ● ● ● ● 9367 Front Floor Frame (2) Step 1 ● ● ● ● ● 8936 Rear Floor Frame (2) Floor Frame Assemblies ● ● ● ● ● 9203 Side Floor Frame (4) The front floor frame is made up of three pieces.
  • Page 15 ● Parts Needed For ● ● ● ● ● ● 5986 Rear Wall Angle (2) Step 2 ● ● ● ● ● 8841 Side Wall Angle (4) Frame Assemblies The main frame pieces reinforce the walls. These pieces will later be in- stalled at the top edge of the side walls and the rear wall.
  • Page 16 ● Parts Needed For ● ● ● ● ● ● 10470 Roof Beam (8) Step 3 Roof Beam Assemblies The roof beams join the two gables and support the roof panels. The main roof beam is made up of four pieces 10470 overlapped back to back at the cen- ter.
  • Page 17 ● Parts Needed For ● ● ● ● ● ● 6403 Door Track Splice (1) Step 4 ● ● ● ● ● 9366 Door Track (2) Door Track Assembly NOTE: Door Track Splice (painted part) The door track assembly supports the sliding doors and reinforces the front wall.
  • Page 18 ● ● ● ● ● Front Floor Assembly (1) ● Parts Needed For ● Step 5 ● ● ● ● ● Side Floor Assembly (2) Floor Frame ● ● ● ● ● Rear Floor Assembly (1) RIGHT REAR 9203 STEP Assemble the four corners of the 8936 floor frame using two screws at each...
  • Page 19 ● ● ● ● ● 9196 Right Corner Post (2) ● Parts Needed For ● ● ● ● ● ● 9197 Left Corner Post (2) Step 6 ● ● ● ● ● Door Track Assembly (1) Posts/Top Frames ● ● ● ● ● Rear Wall Angle Assembly (1) ●...
  • Page 20 ● ● ● ● ● 9195 Splice Post (1) ● Parts Needed For ● Step 7 ● ● ● ● ● 9198 Side Splice Post (2) Splice Post/Door Jamb ● ● ● ● ● 9194 Door Jamb (2) STEP The door jambs reinforce the door opening and provide an attractive ANGLED END OF SPLICE POST MUST...
  • Page 21 ● Parts Needed For ● ● ● ● ● ● 9199 Siding Stud (6) Step 8 Studs The studs provide a surface for at- taching the siding panels. Following dimensions, measuring from the ends of angles, place a stud between each corner and splice post. Position stud inside top angle and fasten with a screw.
  • Page 22 ● Parts Needed For ● ● ● ● ● ● 8584 Side Siding (5 Board) (4) Step 9 ● ● ● ● ● 8585 Side Siding (3 Board) (4) Side Siding ● ● ● ● ● 8583 Side Siding (6 Board) (4) Each screw in the wall requires a washer.
  • Page 23 ● ● ● ● ● 8736 Rear Siding (5 Board) (2) ● ● ● ● ● 5307 Rear Siding (3 Board) (2) ● Parts Needed For ● ● ● ● ● ● 5306 Rear Siding (6 Board) (2) Step 10 ●...
  • Page 24 ● Parts Needed For ● ● ● ● ● ● 8576 Right Gable (2) Step 11 ● ● ● ● ● 8577 Left Gable (2) Gable Assemblies ● ● ● ● ● 6635 Roof Beam Bracket (4) The gables go on top of the front and rear walls to support the roof beams.
  • Page 25 ● Parts Needed For ● ● ● ● ● ● Left Gable Assemblies (2) Step 12 ● ● ● ● ● Right Gable Assemblies (2) Gables/Braces ● ● ● ● ● 9009 Gable Brace (2) Lift and fasten a right and left gable, under angle at corner, to the rear wall angel with screws.
  • Page 26 ● ● ● ● ● Main Roof Beam (1) ● Parts Needed For ● Step 13 ● ● ● ● ● Single Roof Beam (2) Roof Beam/Braces ● ● ● ● ● 9204 Roof Beam Brace (2) Apply the weather stripping along the mating edge of the left and right STEP gables as shown.
  • Page 27 ● Parts Needed For ● Step 14 ● ● ● ● ● 8578 Right Roof Panel (1) Right Roof Panel STEP Installing the roof panels is best done with a step ladder. Begin installing 8579 8578 roof panels at the back right corner of the building.
  • Page 28 ● ● ● ● ● 8578 Right Roof Panel (1) ● ● ● ● ● 8579 Left Roof Panel (2) ● Parts Needed For ● Step 15 ● ● ● ● ● 7571 Roof Panel (2) Roof Assembly ● ● ● ● ● 7743 Roof Panel (2) ●...
  • Page 29 ● ● ● ● ● 8486 Ridge Cap (1) ● ● ● ● ● 7571 Roof Panel (2) ● Parts Needed For ● Step 16 ● ● ● ● ● 8840 Ridge Cap (1) Panels/Ridge Cap/Trim ● ● ● ● ● 8485 Left Side Roof Trim (2) ●...
  • Page 30 ● ● ● ● ● 3719 Door Handle Brace (2) ● Parts Needed For ● ● ● ● ● ● 10483 Right and Left Door (2) Step 17 ● ● ● ● ● 10497 Horizontal Door Brace (4) Door Assembly ●...
  • Page 31 ● Parts Needed For ● ● ● ● ● ● Right Door Assembly (1) Step 18 ● ● ● ● ● Left Door Assembly (1) Door Installation & Adjustment Horizontal Door Brace Gable Door Track Door Slide From inside the building, put the bottom of the right door assembly (on your left when you are inside the building) behind door jamb into the...
  • Page 32 VM108 SOME FACTS ABOUT RUST 1. Avoid nicking or scraping the coating surface, Rusting is a natural oxidizing process that occurs inside and out. when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or 2. Use all the washers supplied. In addition to pro-...