Connecting Backup Power - Pv Point (Op); Safety; Installation - Fronius xPrimo GEN24 4.0 Plus Operating Instructions Manual

Table of Contents

Advertisement

Connecting backup power - PV Point (OP)

Safety

Danger from incorrect installation, commissioning, operation or incorrect use.
This can result in serious injury and damage to property.
Danger due to damaged and/or contaminated terminals.
This can result in serious injury and damage to property.
NOTE!
The continuous supply via the PV Point depends on the available PV power.
If the solar modules are not supplying enough power, interruptions may occur.
IMPORTANT!
The valid national laws, standards and provisions, as well as the specifications of
the relevant grid operator are to be taken into account and applied.
It is highly recommended that the specific installation be agreed with the grid
operator and explicitly approved by this operator. This obligation applies to sys-
tem constructors in particular (e.g. installers).

Installation

NOTE!
All loads that have to be supplied via the OP terminal must be protected by
means of a residual-current circuit breaker.
In order to ensure the residual-current circuit breaker operates properly, a con-
nection must be established between the neutral conductor N´ (OP) and earth.
For the Circuit Diagram recommended by Fronius, see
Point (OP)
WARNING!
Only trained and qualified personnel are authorised to install and commis-
sion the system, and only within the scope of the technical regulations.
The Installation and Operating Instructions must be read carefully prior to
use.
If anything is unclear, contact your vendor immediately.
WARNING!
Before making any connections, check the terminals for damage and con-
tamination.
Remove contamination in the de-energized state.
Have defective terminals repaired by an authorised specialist.
Do not connect any loads that require an interruption-free supply.
on page 193.
Circuit Diagram - PV
83