8.
Network connection multilog 3
8.1.1
Direct connection to a 3-phase low voltage network
Connection in a 3-phase 4-wire AC network
Voltage connection
Ensure that voltage measurement cable PE is connected for every measurement.
If no PE connection is available, connect E and N together.
Ensure that switching (4-wire) is selected. (Setting via display or software)
21
Need help?
Do you have a question about the multilog 3 and is the answer not in the manual?