Operations; Initial Operation; Screen Description - Njoy Ranger 30KT User Manual

Table of Contents

Advertisement

Operations

3

3.1. Initial operation

Step 1.
Before operation, make sure that the two strings of batteries
are connected correctly in order
of the battery pack is at "ON" position (only in case of external battery packs
presence).
Step 2.
Press the
UPS. UPS will enter to power on mode. After initialization, UPS will enter to
"No Output mode".

3.2. Screen description

After initialization, the LCD will display main screen.
There are five sub-menus: Control, Measure, Setting, Information and Data log.
Touch any sub-menu icon to enter into the sub-screen.
Main
of "+,GND,-" terminals and the breaker
POWER button to set up the power supply for the
ON/OFF UPS
Battery test
Mute all
Control
ON/OFF charger
Exit Parallel
Measure 1
Measure
Measure 2
Measure 3
Setting
General
Advance
Basic info
Info
Rated info
Parameter info
Data Log
17

Advertisement

Table of Contents
loading

Table of Contents