Power Head Disassembly/Replacement - Pentair FLECK 5810 XTR Installer Manual

Hide thumbs Also See for FLECK 5810 XTR:
Table of Contents

Advertisement

Installer Manual Fleck 5810 - XTR - Maintenance

9.2.3. Power head disassembly/replacement

No.
A
Remove the controller, see 9.2.2. Controller replacement, page 98.
B
Using a 7 mm wrench or flat screwdriver, unscrew (3).
C
Using a 8 mm wrench or flat screwdriver, unscrew (1) and remove the bloc (2).
D
If present, slip off the meter cable from the gearing system (4).
E
Separate the gearing system (4) from the valve body (6).
F
Put the piston (8) in the higher position possible.
G
Push forward the top plate (5).
H
Fix the new gearing system (4) on the top plate (5), starting form the brine valve side.
Note
If needed, push the piston (8) to have it correctly aligned with the coupling of the gearing
system (9).
Caution
When assembling the gearing system (4) on the valve body (6), make sure to put the widest
part of the piston axe (8) on the left as shown beside.
I
Push back the assembly of the gearing system and the top plate (7).
J
Reverse above procedure steps A to D to rebuilt.
Tip
These operations need to be performed before any cleaning or maintenance procedure.
100 / 124
Operation
Ref. MKT-IM-018 / C - 08.06.2018

Advertisement

Table of Contents
loading

Table of Contents