Download Print this page

ABB EMAX 2 E4.2 Instruction Handbook Manual page 50

Advertisement

50
INSTRUCTION HANDBOOK
6.11 PHASE 11 – POLES SEPARATION
Actions to be performed
Tools
Torx key
198
By means of the torx key unscrew the 2 screws
fixing the operating mechanism fixing plate
No. 30
and the lower cross beam to the poles.
Rod
Min. 200mm
Flat screwdriver
Scissors
200
By means of the rod push as indicated by the
arrow the 2 tie rods.
202
By means of the flat screwdriver unscrew
the screws fixing the 3 wires connecting the
measuring module connector to the sensors
mounted inside the poles.
199
Manually remove the operating mechanism
fixing plate and the lower cross beam.
201
Manually pull the 2 tie rods in order to
complete the removal.
203
By means of the scissors cut the cables coming
out from the poles and after separate the 3
poles.

Advertisement

loading