Signal Check Screen (Manual); Setup Screen - Graco PR-Xv Instructions Manual

Variable ratio metering system
Table of Contents

Advertisement

HMI Display Operation and Identification

Signal Check Screen (Manual)

F
. 22 Signal Check Screen (Manual)
IG
On the Signal Check Screen (Manual), press 'F1' or
select
to display the Manual Main Screen.
The Signal Check Screen (Manual) is to check if the
system communication is correctly connected with the
outside.
28

Setup Screen

Shot Setup Screen
F
. 23 Shot Setup Screen
IG
On the Shot Setup Screen, press 'F1' or select
display the System Main Screen. Press 'F7' or select
to return to the previous screen. Press 'F8' or
select
to continue to the next screen.
The content and functions of this screen are as follows:
Select to set shot rate and shot size. If '0' is set, the
system skips the program number and execute the
following.
The 'Prog.No' is the preset program number of
'Prog.select' for shot mode in automatic operation.
See Working mode, page 21 for more details.
The system supports 16 groups of settings.
to

Advertisement

Table of Contents
loading

Table of Contents